Dev Log: 2026-08-12 — a 96s suite that became 42s, a capability that wasn't a scope, and four steps to a passkey
DEV Community
Dev Log: 2026-08-12 — a 96s suite that became 42s, a capability that wasn't a scope, and four steps to a passkey
Fifteen commits, three repos, and the bulk of it in one: a control plane that got an MCP surface, a...
0 comments
No comments yet.