My regression detector alerted on 4.3 points. The model moves 8.57 between runs.
DEV Community
My regression detector alerted on 4.3 points. The model moves 8.57 between runs.
On 2026-09-23 my drift tracker reported Grok 4.3 down 4.3 points, to 91.4%. The pipeline drafted it automatically, as designed: a finding clears a threshold, a note gets written, a
0 comments
No comments yet.